Chase Farms

Summary

Project Details

Rockford Construction was selected to help Chase Farms solve its frozen food storage problems. The company was outsourcing its frozen product to off-site storage facilities and wanted the capacity to contain operations at a central location. This project included:
Phase One
• 111,500 sq. ft., minus 10 degree freezer
• 8,000 sq. ft. temperature controlled dock
• 3,200 sq. ft. office space
• 5 overhead doors and 1 grade level receiving door
• 44-foot ceiling with double tier 4-high racking system
Phase Two
• 100,000 sq. ft. minus 10 ddegree freezer
• 24,000 sq. ft. repack facililty

“Rockford not only knows how to build industrial, they know how to creatively finance with contacts throughout the banking industry. They put all of that to work for us and the result is, we’ve added more than 400,000 sq. ft. of freezer, processing and repack space in just five years with Rockford by our side.”

Brett Chase | Vice President | Chase Farmschase_farms_1
chase_farms_2
chase_farms_3